The Life filling up - that's the happiness
Ascents:Chomo Lonzo Main(7790m) West face in solo. Spring 2006

The Advanced Base Camp is organized.

02.05.2006

 

The Base Camp had been officially opened on April 26, and the prayerful flags had been stretched.

 

On April 27-29, Valeri was carrying his equipment to the Advanced Base Camp (ABC) which temporarily located on 5750 m.

 

Later on, he is planning to transfer the ABC on 5900 m.

 

Due to the remoteness of the West Face of Chomo Lonzo from the Base Camp, all the way from the BC to the ABC takes from seven to nine hours.

 

Considering the fact that the entire work has to be done by himself, it is a great job.

 

April 30 is the rest day.  The next departure is planning to be done on May 1st. The weather is getting better, so Valeri wants to take good use of lovely days.

 

 

 

Sponsors: BASK, SCARPA, GRIVEL, BEAL, JULBO, METEO FRANCE.

  
Valeri is in ABC at 5900m.
Valeri is in ABC at 5900m.

The tent of ABC at 5900m. West face of Chomo Lonzo Main is behind.
The tent of ABC at 5900m. West face of Chomo Lonzo Main is behind.